Road and Sidewalk Closures

Road and Sidewalk Closures

Location
Begin Date
Estimated End Date
East San Antonio Street: Every Saturday from 7:30 am to 3:00 pm half a block of the street closed from, the Alley to N. LBJ for the Farmers Market on the Square. Main Street Program, 512.393.8430 January 1, 2020 Current 
Victory Gardens Utility Project: The Victory Gardens Neighborhood will undergo a new underground utility installation. The street and sidewalk closure will affect Patton Street. Starting September 1 – September 30, 2021, from 7:00 am - 5:00 pm - Darren - Cox Commercial Construction – 956.601.1645
October 1 @ 7 am  October 31 @ 5 pm
Hopkins Street: Hopkins Street between Bishop Street and Moore Street will be closed to vehicle and pedestrian traffic for a Street Reconstruction Project. Traffic will be detoured to Craddock at both ends of the project, with only local traffic allowed. Phase 4 is underway with local traffic closures from Blanco to Moore Street. The overall completion of the project is anticipated by Spring 2022. Richard Reynosa - City of San Marcos Engineering Department - 512.393.8235 May 2020 Spring 2022
Uhland Road: 1396 Uhland Road to Aquarena Springs Road will be closed to vehicle and pedestrian traffic starting October 1 - November 30, 2021, for a Road Reconstruction Project- Todd Keltgen- 512.212.7990 October 1  November 30 
Guadalupe Street Improvements: Sidewalk closed from Guadalupe Street at Martin Luther King Drive to the railroad crossing for reconstruction. Also, a single lane closure at Hopkins Street at Guadalupe Street. Chris Gonzalez - New Age General Contractors, Inc. – 830.560.9077 Current   
West Sessom Drive: West Sessom Drive from LBJ Drive to Canyon Road will have single lane closures starting August 3, 2021 – August 3, 2023, for Boring Operations – Diego Ratchford – 512.250.8310    August 3, 2021 August 3, 2023
IH-35 Frontage Road: The IH-35 Frontage Road from Rio Vista Street to CM Allen Parkway will be reduced to a single Lane starting September 2021 to November 2021, for a Texas Department of Transportation - Road Reconstruction Project - City of San Marcos Engineering Department - Rohit Vij - 512.393.8133  September 2021 November 2021
Tampico Street: The 100 Block of Tampico Street will be closed starting September 27 – October 29, 2021, in all directions for Materials/Equipment Storage related to the IH-35 Reconstruction Project – Cliff Wharton – 830.643.6927 September 27, 2021 October 29, 2021
Edward Gary: The sidewalk at Edward Gary and East San Antonio will be closed starting on October 21 – November 11, 2021, for the construction of an ADA Ramp – City of San Marcos Public Works – 512.393.8036 October 21, 2021 November 11, 2021